April 17, 2026: Quick update regarding the upcoming traffic changes at the Old Hundred Road and Millridge intersection.

The contractor will not be closing the median crossing until Monday, April 20, 2026. Beginning Monday (April 20) morning, the median crossing will be closed, and a detour will be in place for all left turns into and out of Millridge.

At this time, the right turn from Millridge onto southbound Old Hundred Road will remain open. The contractor intends to maintain this right-turn access throughout construction if possible. They expect to have a clearer determination next week (April 20 – 25) once grading is finalized, and the connection between new and existing asphalt is better defined.

If a temporary closure of the right turn becomes necessary, we anticipate receiving approximately one week’s notice, and the closure would likely be limited to 1–2 days.

We will continue to keep the community informed as more information becomes available.

Previous Update:

March 25, 2026: Refer to the maps linked above for traffic patterns and detours. What to Expect:

  • Week of April 13 (subject to change): A detour at Millridge Parkway is expected to begin.
  • Week of March 30: Paving will begin on sections of Old Hundred (north of Millridge) and new lanes in Market Square. Once paving is complete in Market Square, traffic will shift to the north side, and the south side will be closed for curb and asphalt removal.
  • Late Week of March 30: Work will begin on the southern portion of Old Hundred (Millridge to Route 360).
  • Week of April 6: Pipe installation will begin in the median along Old Hundred.

Important Traffic Changes During Median Work:

  • No left turns or through traffic from Millridge Parkway onto Old Hundred.
  • Right turns from Millridge onto Old Hundred will still be allowed.
  • To travel north on Old Hundred, residents should use Millridge Parkway → Brandermill Parkway → right onto Old Hundred.
  • Northbound Old Hundred traffic will not be able to turn left onto Millridge; drivers will need to continue to Brandermill Parkway and loop back.
  • Residents leaving Market Square can turn left onto Old Hundred and right onto Millridge to return to the community.