Road repairs coming soon

Posted June 11, 2012 at 10:52 AM, Filed Under: BCA News, Community News, Front Page, Village Mill

VDOT crews soon will begin repair work on Brandermill roads in a number of neighborhoods. According to VDOT Residency Administrator Butch Sirry, roads will receive a multi-layer treatment, beginning with cape seal, a tar and gravel application, to strengthen the road and seal all cracks. Once the cape seal cures in about two weeks, slurry seal will be applied.

Sirry asks that residents be patient as uneven pavement and loose gravel will be on the roads and at the edges of the roads until the slurry seal is applied. During the process, parents are encouraged to keep children from bike riding, skateboarding or rollerskating on the roads.

Residents will receive notification from VDOT prior to the start of roadwork in the following neighborhoods: Muirfield Green Drive, Court and Terrace; McTyre’s Cove Road, Place, Lane and Terrace; Winterberry Ridge; Harbour Pointe Parkway, Harbour Hill Road, Place; Harbour Lane; and Spinnaker Cove Road.